A renovation is easier to control when demolition, structural work, services, waterproofing, screeds, finishes and final installations follow a deliberate sequence.
A renovation is easier to control when demolition, structural work, services, waterproofing, screeds, finishes and final installations follow a deliberate sequence.
Start with scope and hidden work
Decide walls, openings, plumbing, electrical routes, drainage and major services before ordering final finishes.
Protect waterproofing and services
Bathrooms, roofs, terraces and wet areas need testing and protection before they are covered.
Leave cosmetic work until the dirty stages are over
Final paint, joinery, fittings and detailed finishes should not be exposed to unnecessary demolition dust and heavy traffic.
When to call Finishline
If the work needs inspection, coordination, specialist trades or recurring follow-up, Finishline can turn the issue into a tracked request with visits, quotations and work history linked to the property.
Need someone to look at the property?
Send Finishline the property, issue and preferred timing. We’ll turn it into a tracked request.
Request a service