Kitchen Renovation: What to Decide Before Ordering Cabinets
Before a kitchen is ordered, confirm appliance positions, drainage, water, electrical loads, ventilation, finished floor level and wall conditions. Cabinet drawings should follow those decisions.
Before a kitchen is ordered, confirm appliance positions, drainage, water, electrical loads, ventilation, finished floor level and wall conditions. Cabinet drawings should follow those decisions.
Measure the finished room
Plaster, tiles and service boxing can change usable dimensions. Final cabinet manufacture should use verified measurements.
Coordinate appliances and services
Ovens, induction hobs, dishwashers, fridges and extractors have specific power, ventilation and connection requirements.
Plan lighting early
Task lighting, under-cabinet lighting and switches are easier to wire before final finishes.
Practical checks and records to keep
Measure the kitchen after confirming finished floor and wall conditions, not only the existing cabinet sizes. Check appliance ventilation and service clearances, power points, water feeds, waste and whether walls support the proposed units. Clarify who removes the old kitchen, repairs plaster, coordinates electricians/plumbers and protects access. Approve a final setting-out drawing before ordering cabinets and confirm lead times and warranty responsibilities.
When to call Finishline
If the work needs inspection, coordination, specialist trades or recurring follow-up, Finishline can turn the issue into a tracked request with visits, quotations and work history linked to the property.
Need help with tiling & screed preparation?
See our scope, common checks and how to request an itemised quotation.
Explore this service →More guides in this category
Need work done on a property?
Send Finishline the property, the issue and any photos. We will coordinate the appropriate next step.