RENOVATION
Bathroom Renovation Planning Checklist
A bathroom renovation should resolve layout, drainage, water feeds, electrical points, waterproofing and ventilation before tiles and sanitary ware are finalised.
A bathroom renovation should resolve layout, drainage, water feeds, electrical points, waterproofing and ventilation before tiles and sanitary ware are finalised.
Confirm the layout first
Moving toilets, showers and basins can change drainage complexity and floor build-up.
Treat waterproofing as a system
Corners, penetrations and shower areas need compatible detailing, not only waterproof paint on an arbitrary surface.
Plan access for future repairs
Valves, traps and serviceable components should remain accessible where practical.
Practical checks and records to keep
Inspect for existing damp, plumbing condition, floor level constraints, ventilation, doorway clearance and the position of floor drains before selecting fittings. Agree whether all waterproofing layers, shower falls, tile trims, electrical points, waste disposal and painting are included. Ask who performs leak testing before tiling covers the system. Record concealed pipe runs and waterproofing photos for future maintenance.
When to call Finishline
If the work needs inspection, coordination, specialist trades or recurring follow-up, Finishline can turn the issue into a tracked request with visits, quotations and work history linked to the property.
Need help with tiling & screed preparation?
See our scope, common checks and how to request an itemised quotation.
Explore this service →More guides in this category
Need work done on a property?
Send Finishline the property, the issue and any photos. We will coordinate the appropriate next step.