RENOVATION
Bathroom Renovation Planning Checklist
A bathroom renovation should resolve layout, drainage, water feeds, electrical points, waterproofing and ventilation before tiles and sanitary ware are finalised.
A bathroom renovation should resolve layout, drainage, water feeds, electrical points, waterproofing and ventilation before tiles and sanitary ware are finalised.
Confirm the layout first
Moving toilets, showers and basins can change drainage complexity and floor build-up.
Treat waterproofing as a system
Corners, penetrations and shower areas need compatible detailing, not only waterproof paint on an arbitrary surface.
Plan access for future repairs
Valves, traps and serviceable components should remain accessible where practical.
When to call Finishline
If the work needs inspection, coordination, specialist trades or recurring follow-up, Finishline can turn the issue into a tracked request with visits, quotations and work history linked to the property.
Need someone to look at the property?
Send Finishline the property, issue and preferred timing. We’ll turn it into a tracked request.
Request a service